The lighting legend points to a fixture schedule. The sheet has none.

The Main Plaza project renews a public plaza in downtown San Antonio. It includes many light fixture types and a rooftop heating and cooling unit. Our review found two places where the drawings leave a bidder without one clear answer.

Documents reviewedOctober 25, 2026
Documents checked throughOctober 25, 2026
Examples on this page2 selected findings

Finding 01

The lighting legend sends bidders to a fixture schedule that is missing.

Sheet LD101 is titled "Enlarged Lighting Layouts and Fixture Schedule". Its legend says "See fixture schedule on sheet LD101 for full specifications." The sheet shows the restroom building plan, the vault level plan and the legend. It shows no fixture schedule.

Legend note

See LD101

Points to a fixture schedule

Sheet LD101

No schedule

Two plans and a legend only

Why it matters

The legend lists fixture types from F1A to XF11, including pole lights, string lights and an RGBW floodlight. Without the schedule, a bidder has no manufacturer, catalog number or wattage to price.

The question to ask

Sheet LD101 directs bidders to a fixture schedule on LD101, and none appears there. Please issue the complete luminaire schedule with manufacturer, catalog number, wattage, voltage and mounting for each type.

See the actual drawing excerpts

LD101, sheet 154 of 220, title block and legend. Source report finding 1.

LD101 legend: SEE FIXTURE SCHEDULE ON SHEET LD101 FOR FULL SPECIFICATIONS.
LD101 legend: SEE FIXTURE SCHEDULE ON SHEET LD101 FOR FULL SPECIFICATIONS. Excerpt from public bid documents issued by the owner, used for commentary. Open full size ↗
LD101 title block: ENLARGED LIGHTING LAYOUTS AND FIXTURE SCHEDULE. The sheet shows a restroom lighting plan, a vault lighting plan and the legend. It shows no fixture schedule.
LD101 title block: ENLARGED LIGHTING LAYOUTS AND FIXTURE SCHEDULE. The sheet shows a restroom lighting plan, a vault lighting plan and the legend. It shows no fixture schedule. Excerpt from public bid documents issued by the owner, used for commentary. Open full size ↗

What we know now: As of October 25, 2026, no addendum or bidder question addressed the lighting schedule.

Finding 02

The rooftop unit has different electrical data on two sheets.

The M502 rooftop unit schedule lists RTU-1 with a 5 HP fan motor at 208/3, MCA 74.0 and MOCP 80.0. The E600 equipment connection schedule lists RTU-1 at 3 HP, 51.2 A full load, 64.0 A MCA and 70.0 A MOCP.

Mechanical schedule

5 HP, MCA 74.0

M502, RTU-1

Electrical schedule

3 HP, MCA 64.0 A

E600, RTU-1

Why it matters

The mechanical and electrical trades could price different units. The wire and breaker size follow whichever data governs. The numbers alone do not show a code problem.

The question to ask

M502 lists RTU-1 at 5 HP, MCA 74.0 and MOCP 80.0. E600 lists it at 3 HP, MCA 64.0 A and MOCP 70.0 A. Please confirm the governing RTU-1 electrical data and update the electrical design to match.

See the actual drawing excerpts

M502, rooftop unit schedule; E600, equipment connection schedule. Source report finding 2.

M502 RTU-1: FAN MOTOR (HP / V / PH) 5 / 208 / 3, MCA 74.0, MOCP 80.0.
M502 RTU-1: FAN MOTOR (HP / V / PH) 5 / 208 / 3, MCA 74.0, MOCP 80.0. Excerpt from public bid documents issued by the owner, used for commentary. Open full size ↗
E600 RTU-1: 208/3, motor 3 HP, 51.2 A, MCA 64.0 A, MOCP 70.0 A.
E600 RTU-1: 208/3, motor 3 HP, 51.2 A, MCA 64.0 A, MOCP 70.0 A. Excerpt from public bid documents issued by the owner, used for commentary. Open full size ↗

What we know now: As of October 25, 2026, no addendum or bidder question addressed the RTU-1 data.

Document status

These findings describe the documents checked on October 25, 2026. We have no confirmed project-team answer or cost saving. The next step is a question to the designer before bids are priced.

These examples are questions for the project team to check. They are not a design approval or a complete review of the project. Bidders should send questions only through the owner’s official question process.

See an error? Email contact@mebbian.ai and we will correct the page.

Questions about this review

Are there drawing conflicts in the San Antonio Main Plaza Renovations bid set?

Mebbian's reviewer-led check found a lighting legend on LD101 that points to a fixture schedule the sheet does not show. It also found RTU-1 listed at 5 HP on M502 and 3 HP on E600. These findings describe the documents checked on October 25, 2026.

How do you check a lighting legend against the fixture schedule?

Follow each legend note to the sheet it names and confirm the schedule is there. Mebbian's reviewer-led check found the LD101 legend points to a schedule on LD101 that does not appear. These findings describe the documents checked on October 25, 2026.

How Mebbian checks building plans →

Source documents

Check the original documents.

Project listed as: City of San Antonio Main Plaza Renovations, RFCSP 2026-118

Bid drawings for RFCSP 2026-118, including LD101, M502 and E600, and the project manual.

City of San Antonio bid documents on CivCast ↗

Search for Main Plaza Renovations or RFCSP 2026-118. A CivCast account may be needed to open the documents. Later changes may resolve a finding. Use the latest documents for any bid or design decision.

What’s your next job?

We’ll prepare your next bid, or redline your next set before it goes out.

Get started